论文部分内容阅读
一、总体布置工程位于某地山体中,山势较级,两边有公路通过,一侧为公共汽车站(图一)。总体布置主要考虑了以下要求: 1.为保征车辆在存放过程中,能处于良好的技术状态,便于及时出车,安全完成运输任务。其工程包括车库、保养间、办公生活用房、发电机站及出入口五个部分。平时供某运输队及公共汽车站使用,战时统一指挥管理。运输队存放解放牌车70辆,并使用管理
First, the overall layout of the project is located in a place in the mountains, the mountain is more grade, both sides of the road through, one side for the bus station (Figure 1). The overall arrangement mainly considers the following requirements: 1. In order to guarantee the vehicle during the storage process, it can be in a good technical state, easy to get out of the vehicle in time, and safely complete the transportation task. The project includes garages, maintenance rooms, office living rooms, generator stations, and entrances and exits. Usually used by a transportation team and bus station, unified command and management in wartime. The transportation team stores 70 liberation vehicles and uses management