中梁山及缙云山两座隧道不但长度大,而且工程地质及水文地质极其复杂。在建设中,应用了现代科技中的新技术、新工艺、新材料,从而达到缩短工期,节约建设投资,保证工程质量和安全施工。诸如隧道通风方案的选择、防止隧道渗漏水的方法、快速的新奥法全断面施工、地质雷达预挠地层指导开挖、管棚法治理断层以及采用新材料和代用材料等,对隧道建设都起到重要作用。
The two tunnels in Zhongliangshan and Jinyun Mountains are not only large in length, but also extremely complex in engineering geology and hydrogeology. In the process of construction, new technologies, new techniques and new materials in modern science and technology have been applied so as to shorten the construction period, save construction investment, and ensure the construction quality and safe construction. Such as the selection of tunnel ventilation scheme, the method of preventing water leakage from the tunnel, the rapid construction of new Austrian law and full face construction, the guidance and excavation of prestressed ground penetrating radar, the management of faults by pipe shedding method and the adoption of new materials and substitute materials, etc., Have played an important role.