爬升平台结合滑模施工法是在英国威斯敏斯特(National Westminster)银行45层大楼建设中创造出来的。该楼座落在伦敦中心区;结构复杂,设计以高200米、有12边不规则体形的钢筋混凝土中央筒体作为主体结构。筒体内有13座电梯并和其它内壁。筒外壁辐射出悬臂钢梁与外圈钢框架构成外
The climbing platform combined with the sliding mode construction method was created in the construction of the 45-story building of National Westminster Bank. The building is located in the heart of London; it has a complex structure and is designed as a main structure with a 200-meter-high, 12-sided, irregularly shaped reinforced concrete central barrel. There are 13 elevators in the cylinder body and other inner walls. The outer wall of the canister radiates out the cantilevered steel beam and the outer ring steel frame constitutes the outside