针对现浇预应力混凝土框架结构三种常用施工顺序,分析了各种顺序的施工过程对结构的受力及今后使用产生的影响,阐明各施工顺序对结构的适应程度并给出调整其适应能力的具体方法。
In view of the three common construction sequences of cast-in-place prestressed concrete frame structures, the impact of various sequential construction processes on the structure’s stress and future use is analyzed, and the degree of adaptation of the construction sequence to the structure is explained and its adaptability is given. The specific method.