EVALUATION OF CIRRHOTIC LIVER WITH PERFUSION-WEIGHTED MAGNETIC RESONANCE IMAGING: A PRELIMINARY EXPE

来源 :中国医学科学杂志 | 被引量 : 0次 | 上传用户:eric7272
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Objective To investigate the role of perfusion-weighted magnetic resonance imaging (MRI) in evaluation of cirrhotic liver.Methods With a 4F catheter,1% diluted carbon tetrachloride (1 ml/kg) was selectively injected into right or left hepatic artery of 12 dogs fortnightly.The half liver into which carbon tetrachloride was injected was called as study side (SS),while the other half liver without carbon tetrachloride injection was called as study control side (SCS).Conventional and perfusion-weighted MRI were performed in every 4 weeks.Via a 4F catheter,5ml gadolinium diethylentriamine pentaaceti acid (Gd-DTPA) dilution was injected into superior mesenteric artery at the 5th scan.The signal intensity-time curves of SS,SCS,and portal vein were completed in MR workstation.The maximal relative signal increase (MRSI),peak time (tp),and slope of the curves were measured.Results On conventional MR images,no abnormalities of externality and signal intensity were observed in both SS and SCS of liver at each stage.The mean tp,MRSI,and slope of intensity-time curves in normal liver were 10.56 seconds,1.01,and 10.23 arbitrary unit (au)/s,respectively.Three parameters of curves didn't show obvious change in SCS of liver at every stage.Abnormal perfusion curves occurred in SS of liver at the 12th week after the 1st injection.The abnormality of perfusion curve in SS was more and more serious as the times of injection increased.The mean tp,MRSI,and slope intensity-time curves in SS of liver were 19.45 seconds,0.43,and 3.60 au/s respectively at the 24th week.Conclusion Perfusion-weighted imaging can potentially provide information about portal perfusion of hepatic parenchyma,and to some degree,reflect the severity of cirrhosis.
其他文献
人民防空工程是城市建设、发展利用地下空间的重要基础设施,可以从整体上增强城市综合发展能力和防护能力,使城市具有平时发展经济、抗御自然灾害,战时防空抗毁、保存战争潜力的
近年来随着科学技术的进步,我国已经逐步进入信息化时代。信息技术已经在无形中深入到了我们生活的方方面面,为我们的生活提供了更加方便,快捷的服务。同样在新时代建筑施工工程
随着我国城市建设的不断发展,人们对城市建筑质量的要求也越来越高,加强建筑施工的管理工作是十分必要的。在建筑施工管理工作中,协调好各个部门的工作,是保证工程顺利进行的关键
对于任何的工程来说,必须在规定的时间内来完成工程建设,这也是体现施工企业的业务能力的一个方面,如果因为某些原因造成的工程的延误,不仅对施工企业的形象和未来的发展产生不利
建筑工程质量关系到我国的基础性建设,关系到人们生命财产的安全,其重要性不言而喻。建筑工程的质量管理是一项复杂的工作,具有较高的技术性,因此,施工建设单位必须高度重视对工程
当今社会,我国经济的不断的发展,民用建筑中电气安装工程是一个重要的工程,对它的施工质量要求也就随着社会的发展越来越高,这样的情况下施工质量的控制要点也就在不断地被提上日
随着社会的发展,建筑工程也有了飞速的发展。由于建筑工程是一个十分复杂的工程,对于建筑工程的工程造价进行的管理就变得十分的重要,对工程造价进行管理关乎整个施工企业经济利
随着经济的发展,城市规模越来越大,城市中大型公共建筑项目越来越多,能源消耗也日益严重,建筑节能问题越来越受到人们的关注。目前,我国的大型公共建筑多数都是高耗能的,与当前倡导
本文简述了建筑物各类基础的分类及结构和施工特点,阐述了各类基础的优劣及特点,并在此基础上简述了针对针对各类基础的特点所采用的施工方法。从基础选择到施工特点做出了比较
项目管理法管理水平的高低不仅关系着整个工程建设是否可以顺利完工,而且直接影响着整个工程质量的高低,甚至还对建筑工程项目的整体社会效益与经济效益有着重要的影响。因此,将