论文部分内容阅读
1949年建国时 ,全国水电装机容量 36万 k W中 ,除东北 3座大中型水电站共装机 34.85万 k W(丰满 2台大机组共 1 3.2 5万 k W,中朝鸭绿江水丰送电 1 8万k W,黑龙江镜铂湖 3.6万 k W)外 ,其余小水电站等共计仅 1万余 k W。经济恢复期和第一个五年计划时期建了一些小水电站 ,1 957
When the country was founded in 1949, the country’s installed capacity of hydropower was 360,000 kw, with a total of 348,500 kw installed in three large and medium-sized hydropower plants in the northeast (a total of 13200 kw in 2 full-sized turbines). Million k W, Heilongjiang Jinghu Lake 36,000 k W), the remaining small hydropower stations and other total only only 10,000 kw. During the economic recovery period and the first five-year plan period, a number of small hydropower stations were built, 1,957