江垭水利枢纽金属结构工程主要包括大坝泄洪建筑物闸门、引水压力钢管、电站与灌溉工程以及通航建筑物金属结构等五大部分。 1996年 11月 ,通过招标确定了金属结构制造和安装单位 (承包商 ) ,1998年 9月中孔弧门及启闭机械安装完毕 ,1998年 12月底引水发电系统金属结构及启闭机械安装完毕 ,并通过验收 ,1999年 11月大坝金属结构全部安装完毕 ,并通过试运行验收。金属结构制安进度、质量及投资得到了有效的控制 ,合同管理工作顺利。金属结构项目各类闸门及启闭机械运行正常 ,并已投入使用 ,满足了大坝安全度汛和发电的要求
Jiangya Water Control Project metal structures include dam flood discharge gates, water diversion pressure pipe, power station and irrigation works and the navigation structure of the metal structure of five major parts. In November 1996, the unit for the manufacture and installation of metal structures (contractor) was identified through bidding. In September 1998, the installation of the Zhongkeng Arc Gate and the opening and closing machinery was completed. At the end of December 1998, the metal structure of the water diversion and power generation system and the opening and closing machinery were installed , And passed the inspection. In November 1999, the dam metal structure was completely installed and passed the test run acceptance. The safety, quality and investment of the metal structure have been effectively controlled, and the contract management work is proceeding smoothly. All kinds of gates and opening and closing machinery of the metal structure project are in normal operation and have been put into operation to meet the flood control and power generation requirements of the dam