遵从核电质量保证对工程研究开发的规定,以及基于核电工程试验的实施过程具有质量保证中规定的“特殊过程”的基本特征,提出了核电工程试验成功的标志与主要准则.从试验目标和质量保证2个角度,明确了核电工程试验各个阶段的控制要素和进行验证的要求.对试验设施可用性验证是试验过程控制的最重要环节,正式试验之前必须验证和确认试验模型特征量正确、关键参数测量准确、工况保障条件可控、质/能平衡测定合格和典型工况试验结果合理,以确保试验数据有足够的置信度.在国家大型先进压水堆核电站重大专项关键试验项目中,已全面实施了这种过程控制的相关程序,有效地促进了试验成功.
According to the provisions of nuclear power quality assurance research and development of the project, and based on the basic characteristics of the “special process” specified in the quality assurance of the implementation process of the nuclear power engineering test, the successful sign and the main criteria of the nuclear power engineering test are put forward. And quality assurance, the control elements and the requirements of verification are clearly defined in each phase of the nuclear power engineering test.The verification of the usability of the test facility is the most important part of the test process control. Before the formal test, it is necessary to verify and confirm that the characteristic quantities of the test model are correct, Key parameters of measurement accuracy, condition protection conditions controllable, qualitative / energy balance test and typical conditions test results reasonable to ensure that the test data have enough confidence in the national large-scale advanced pressurized water reactor nuclear power station key projects in key projects , Has fully implemented the relevant procedures for this process control and effectively promoted the success of the trial.