全省基本建设部门的建筑工程截至目前为止,除个别冬季施工工程外已经全部收工了。在全体职工热情劳动积极努力下,基本上完成了一九五三年国家规定的基本建设任务。特别是重点工程一般完成得较好。半年多来,在建筑企业中,我们坚持贯彻了「又好、又快、又省、又安全」的方针。首先根据这一方针普遍开展了反反无人负责和建立责任制运动,特别从六月开始连续地深入地进行了质量检查,严格地批判与纠正了各种各样的忽视质量的错误倾向,从而在全体职工中初步树立了「质量第一」的观念。同时强调以改进技术管理为中心,从各方面改善工地管理工作。这样到九月增产节约竞赛运动开展之后,成效是很显著的。在保证质量的基础上,普遍加速了工程进度,从而降低了建築成本。广大职工的技术业务水平和整个建筑企业的管理水平也均有不同程度的提高。在政治工作方面,自上而下建立了机构,在七月以前因干部少而
So far, the construction projects of the capital construction sector in the province have all been closed except for some individual winter construction projects. With the enthusiastic efforts of all staff and workers, we have basically completed the capital construction tasks stipulated by the state in 1953. In particular, the key projects are generally completed better. For more than six months, in construction enterprises, we have adhered to the principle of “good, fast, safe and secure”. First of all, according to this guideline, a general anti-and anti-vice responsibility and the establishment of a system of accountability were carried out. In particular, the quality inspection conducted in continuous and in-depth manner since June, strictly criticizing and correcting various erroneous tendencies of neglecting quality, As a result, the concept of “quality first” has been initially established among all staff and workers. At the same time, it emphasizes improving technology management as the center and improving site management in all aspects. In this way, after the campaign to increase production and save competition in September this year, the result is remarkable. On the basis of ensuring the quality, the progress of the project is generally accelerated, thereby reducing the construction cost. The technical service level of the vast number of workers and the management level of the entire construction enterprise also have different degrees of improvement. In political work, a top-down body has been established, with fewer cadres by the end of July