我国新一轮抽水蓄能电站规划选点工作基本完成,22个省(区)共规划59个站点,总装机7485万kW。抽水蓄能电站是电力系统中具有调峰、填谷、调频、调相和事故备用等多种功能的特殊电源,运行灵活,反应快速。随着我国经济的快速发展,电力负荷持续增长。峰谷差逐步加大。抽水蓄能电站是解决电力系统调峰问题以及确保安全可靠运行的有效手段和经济现实手段。为了加强抽水蓄能电站技术交流,总结运行经验,进一步规范和加强建设管理,促进抽水蓄能电站的健康有序发展,2009年8月7日,国家能源局在山东泰安召开了抽水蓄能电站建设工作座谈会、会议总结和交流了抽水蓄能电站建设经
China’s new round of pumped storage power station planning point of work is basically completed, 22 provinces (autonomous regions) a total of 59 sites planned with a total installed capacity of 7485MW. Pumped storage power station is the power system with peaking, filling, FM, phase modulation and accident backup and other special power supply, flexible operation, fast response. With the rapid economic development in our country, the power load continues to grow. Peak-valley difference gradually increased. Pumped storage power station is to solve the problem of power system peak regulation and ensure safe and reliable operation of the effective means and economic realities. In order to strengthen the technical exchange of pumped storage power station, summarize operational experience, further standardize and strengthen construction management and promote the healthy and orderly development of pumped storage power station, on August 7, 2009, the National Energy Administration held a pumped storage power station in Taian, Shandong Province Construction work forum, meeting summed up and exchange pumped storage power station construction by