The current paper deals with the evaluation of the BANCS erosion prediction model and its two componentsethe Bank Erosion Hazard Index(BEHI)and Near-Bank Stress
The cascading failure of multiple landslide dams can trigger a larger peak flood discharge than that caused by a single dam failure.Therefore,for an accurate nu