Charge planning is one of batching problems for steelmaking and continuous casting production,and its optimization will be conducive to subsequent cast planning.Charge planning problem in the twin strands continuous casting production was studied,where ca
In cold rolling process,the flatness actuator efficiency is the basis of the flatness control system.The precision of flatness is determined by the setpoints of