2001年6月份,西林钢铁公司炼铁总厂两座100m~3高炉L04和L08铁占有率为88.66%,同比提高近40%,为降焦增铁创造了条件,主要采取了以下几方面措施:
June 2001, Xilin Iron and Steel Plant Iron and Steel Plant two 100m ~ 3 blast furnace L04 and L08 iron occupancy rate of 88.66%, an increase of nearly 40%, to reduce the iron to create the conditions for the coke, the main take the following measures :