海洋石油开发工程设计(塘沽)公司在BZ 34油田二期工程中,从设计上挖潜力,努力降低工程造价,节约资金21.43万美元。 BZ 34油田二期工程,在材料设备采办阶段,多次遇到国际市场石油设备材料成倍上涨的严峻局面。面对这一情况,该公司BZ 34项目组与专业设计人员根据市场变化,多次修改设计方案,并对以往BOC库存剩料进行了清理利用。配管专业共清理出各种管件973件,阀门186个,各种管材近1000m,价值15万美元。BZ 34二期工程中需用三个管汇,如购买国外现成产
Offshore Oil Development Engineering Design (Tanggu) Company In the second phase of BZ 34 Oilfield, digging potential from the design, and strive to reduce construction costs, saving 214,1400 US dollars. BZ 34 Oilfield Phase II project, materials and equipment procurement phase, repeatedly encountered in the international market doubled the rigging of oil equipment materials situation. Faced with this situation, the company BZ 34 project team and professional designers based on changes in the market, many times to modify the design, and the BOC inventory remaining material used to clean up. A total of 973 plumbing cleared a variety of fittings, valves 186, all kinds of pipe nearly 1000m, worth 150,000 US dollars. BZ 34 two projects need three manifold, such as the purchase of ready-made foreign products