映秀湾工程人工砂质量控制与工艺设计(续)

来源 :浙江水利科技 | 被引量 : 0次 | 上传用户:yiluyouyu
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
五、石粉含量及细度模数选择有关混凝土成果分析(一)石粉含量的确定如前所述当 F·M=2。5~3范围变化时,棒磨机出口处石粉含量达21~14%。这么多的石粉能否使用,使用多少,这直接关系到人工砂产品利用率、粉料清理量、成本及混凝土的质量。试验得出,人工砂粉末,不同于一般河砂中小于0.15毫米颗粒。因为人工砂的粉末成分与所加工的岩石成分基本一致。从表5可见,主要成分是硅、铝、钙,能烧失的量很小。此 Fifth, the stone content and fineness modulus selection Analysis of the results of the concrete (A) to determine the content of stone powder As mentioned earlier when the F · M = 2.5 ~ 3 range changes, the outlet of the rod mill stone powder content of 21 to 14 %. The availability and use of so much stone dust is directly related to the utilization of artificial sand products, the amount of powder cleaning, the cost and the quality of the concrete. Tests have shown that artificial sand powder, different from the general river sand particles smaller than 0.15 mm. Because artificial sand powder composition and processed rock composition is basically the same. Can be seen from Table 5, the main component is silicon, aluminum, calcium, can burn a small amount. this
其他文献
(一)基本情况鲁北——山东省黄河以北地区,面积约3万平方公里,耕地2400多万亩,约占山东省耕地面积的四分之一,以种植小麦、玉米、棉花为主。鲁北引黄灌溉始于1955年,60年代
一、前言现在,水库淤积问题越来越引起水库管理部门和水土保持部门的重视。水库淤积测量方法一般都采用断面法、地形法、混合法及探坑法等,但是无论哪一种测验方法,计算量都
我国跨流域大型调水工程——引黄济青工程已于四月十五日正式动工,该工程横跨四个地市、十个县,穿过大小三十六条河流,从鲁西北博兴县的引黄闸到达青岛市的河东水厂,全长二
一、概况我县的小型水库以灌溉为主,结合发电。灌溉放水采用底层涵管设施,由于库底水温低,用低温水灌溉对农作物生长有影响,为了获得水稻的增产,选择坝高在25米以上的剡源和
常熟市商业局“一手抓商场,一手抓市场”,积极探索商品流通的市场化格局。近年来,全局系统建办各类市场13家,总投资六千万元,其中已经开业的有农副产品交易城等7家,预计年成
一、概述 鲁布革水电站位于云南省罗平县境内黄泥河下游,是一座混合式地下电站。厂区地下建筑物的规模较大,主、副厂房开挖尺寸的长×宽×高为125.0米×18.0米×38.4米。 鲁
串沟、堤河也被称为暗险,亦称岔流。洪水漫滩时,串沟在河滩上与河並行泄洪。历史上辽河许多变迁、改道都是由岔流演变为主流而颓岸出险。因此,有计划地把串沟、堤河淤平,不
语言是社会发展到一定阶段的产物,社会的发展进步离不开语言的发展进步。不同社会时期,语言也呈现出不同的特点。随着中国改革开放政策的实施,人们的思想逐渐开放,新词新语不
1 病例报告患者男 ,5 8岁 ,主因进食时吞咽困难 ,剑突下疼痛 ,伴胸骨后闷胀感 2 0 d入院。查体 :体表淋巴结未触及肿大 ,剑突下轻压痛。胃镜检查见食管中段距门齿 2 5 cm 9
在过去几十年中35—220KV 架空线路的结构很少有所改进。常见的35—220KV 架空线路一般都采用单根导线和较大的相间距离。确定相间距离的重要条件是防止在一定的条件下档距