东西关水电厂位于武胜县境内嘉陵江上,是一以发电为主的综合开发工程,装机容量18.0万kW。我院于1988年11月完成了初步设计报告编制工作,1989年元月,四川省建委主持了有能源部、水利部水利水电规划设计总院、交通部水运规划设计总院等单位参加的初步设计报告审查会,并批复了初步设计报告。1991年5月,中国华能集团投资公司与四川省能源交通投资公司及有关地县签订了合资建设四川华能东西关水电厂的联办合同,组建了董事会和建设管理局。1991年7月,中国国际工程咨询公司对该工程进行了评估,1992年元月,国务院批准同意建设四川华能东西关水电厂。至此。工程开工前的前期工作已基本完成。
Located on the Jialing River in Wusheng County, the East-West Guanshui Power Plant is a comprehensive development project focusing on power generation with an installed capacity of 180,000 kW. Our institute completed the preparation of the preliminary design report in November 1988. In January 1989, the Sichuan Provincial Construction Commission presided over the preliminary participation of the Ministry of Energy, the Ministry of Water Resources and Hydropower Planning and Design, and the Ministry of Transport’s Water Transport Planning and Design Institute. A report review meeting was designed and a preliminary design report was approved. In May 1991, China Huaneng Group Investment Co., Ltd. signed a joint venture contract with Sichuan Energy and Transportation Investment Corporation and related counties to establish a joint venture contract for the construction of the Sichuan Huaneng East-West Water Power Plant and set up a board of directors and a construction authority. In July 1991, China International Engineering Consulting Corporation conducted an assessment of the project. In January 1992, the State Council approved the agreement to build a Sichuan Huaneng East-West Guan hydropower plant. So far. The preliminary work prior to the start of the project has been basically completed.