论文部分内容阅读
本文通过对箱梁结构的温度分布及温度荷载影响的分析 ,结合特大桥悬臂合拢段的施工实践 ,对合拢温度的控制进行了论述
Based on the analysis of the temperature distribution and temperature load of the box girder structure and the construction practice of the cantilever closing section of the bridge, the control of the closing temperature is discussed