论文部分内容阅读
1概述苏家河口水电站坝型为混凝土面板堆石坝,坝顶高程1 595 m,河床部位建基面高程1 465 m,最大坝高130 m,坝顶长度443·917 m,坝顶宽度10·00 m,坝顶设高为4·2 m的钢筋混凝土防浪墙,坝体上游坡为1∶1·4,下游综合坝坡为1∶1·712。下游面设3台马道及坝后公路,道路间坝坡设干
1 Overview The dam type of Sujiahekou Hydropower Station is a concrete faced rockfill dam with an elevation of 1595 m and an elevation of 1 465 m at the riverbed and a maximum dam height of 130 m with a crest length of 443.917 m and a crest width of 10 At the height of 00 m, a reinforced concrete wave wall with a height of 4.2 m is installed on the crest. The upper slope of the dam is 1: 1.4 and the downstream integrated slope is 1: 1.12. The downstream face set up 3 horseshoe Road and Dam Road, between the road dam slope set dry