主要介绍了001水电站1#水轮发电机组安装前对机坑测定进行的主要措施和控制点进行研究和探讨。以保证水轮发电机优良安装,能达到提前完工。
This paper mainly introduces the main measures and control points of pit measurement before the installation of No.1 hydroelectric generating set in 001 Hydropower Station. To ensure the excellent installation of hydroelectric generators, can be completed ahead of schedule.