论文部分内容阅读
The purpose of this study is to optimize the mass of 1.5 MW wind turbine steel tower performing Genetic Algorithm method (GA). In accordance with ASCE 7-98, AISC-89 and IEC61400-1 , the impact of loads on tower is calculated within the highest safety cond