武钢4号高炉于1984年7月10日停炉大修,同年10月31日开始第二代炉役。由于炉腹冷却壁严重破损,订于1988年12月进行一次中修。这一代炉身寿命为50个月。在第一代大修期间进行了不少项目的技术改造,例如风口数目由24个增加到28个,死铁层厚度由700毫米增到1100毫米等。但是一些工程量较大的项目,如无料钟炉顶、热风炉采用陶瓷燃烧器等,因受施工时间和资金的限制,未能进行改造。4号高炉开炉四年来的生产实践表明:采用的先进工艺和设备,在4号高炉强化冶炼上发挥了积极作用。同时,也看到提高设计质量、避免失误,对提高生产水平、改善技术经济指标有十分重要的作用。近几年来,在冶炼工艺方面积极采用先进技术,使高炉的生产面貌发生了显著变化。
WISCO No.4 blast furnace was shut down for overhaul on July 10, 1984, and the second generation of furnace service began on October 31 of the same year. Due to severe damage to the bosh stalemate, scheduled for December 1988 for a repair. This generation of shaft body life of 50 months. During the first overhaul, many projects were undergoing technological improvements such as increasing the number of tuyeres from 24 to 28 and increasing the thickness of dead iron from 700 to 1100 mm. However, some projects with large quantities, such as the bell-less top and the stove with ceramic burners, were not renovated due to construction time and capital constraints. The production practice of No.4 blast furnace during the four years shows that the advanced technology and equipment adopted play an active role in strengthening the smelting of No.4 blast furnace. At the same time, we also see that improving the quality of design and avoiding mistakes have a very important role in raising the level of production and improving the technical and economic indicators. In recent years, the advanced technology has been actively adopted in the smelting process so that the production aspect of the blast furnace has undergone significant changes.