电子部六所与本溪钢铁公司合作开发的本钢动力生产计算机调度系统一期工程,于87年12月在本钢现场安装,调试和运行。本钢动力生产计算机调度系统按本钢动力生产两级调度、三级管理原则,系统由公司级动力调度系统,发电厂、计控厂、动力厂、供水厂、氧气厂、燃气厂等六个厂级调度系统,继电保护、计控站、水源监控站、动力女电站等26个站级计算机监控系统组成,机器间最短距离为五公里,最远的为30公里。采用MODEM和市话线构成链路,组成树形硬件网络,依靠通讯软件包完成环形通讯功能。该系统能在线进行数据收集处理,越限报警处理、
The first phase of Bengang Power Generation Computer Scheduling System developed by the Ministry of Electronics and the Benxi Iron and Steel Company was installed, commissioned and operated at Bengang in December, 87. Bengang power production computer scheduling system according to Benxi power generation two-level scheduling, three management principles, the system consists of company-level power scheduling system, power plants, control plants, power plants, water supply plants, oxygen plants, gas plants, six Plant-level dispatching system, relay protection, control station, water monitoring station, power women’s station 26 station-level computer monitoring system, the shortest distance between the machine is five kilometers, the furthest is 30 kilometers. The use of MODEM and local lines constitute a link to form a tree hardware network, rely on communication software package to complete the ring communication. The system can online data collection and processing, the more limited alarm processing,