一、前言炉内受热面的结渣是严重影响电站锅炉安全、经济运行的主要问题之一。目前国内对电站新工程设计煤种结渣特性的判别,仍停留在五十年代的水平上,即粗略地用弱还原气氛灰熔点来估计。由此在锅炉炉膛热负荷等主要设计选型参数选用上,往往造成失误。近年国内燃煤电厂发生多起炉内严重结渣现象,莱芜电厂125MW机组长期降负荷至110MW运行;锦州电厂3台200MW机组投产后达不到铭牌出力,1985年上半年仅完
I. Preface The slagging of the heating surface in the furnace is one of the major problems that seriously affect the safety and economic operation of power plant boilers. At present, the judgment on the slagging characteristics of new coal-fired power plants in China is still at the level of the 1950s, which is roughly estimated by the gray melting point of the weak reduction atmosphere. Thus in the boiler furnace heat load and other major design selection parameters, often result in errors. In recent years, many domestic coal-fired power plants in the furnace from the phenomenon of serious slagging, Laiwu Power Plant 125MW long-term load drop to 110MW operation; Jinzhou Power Plant 3 200MW units put into operation after the reach of nameplate output, only the first half of 1985