西安铁路局围绕第六次大面积提速,加强工务系统安全基础建设,拨移线间距和调整线路纵坡,更换可动心轨道岔,利用全站仪校核提速区段道岔、线路平纵断面位置,正线铺设跨区间无缝线路,采用探地雷达等物探方法对路基进行检测。在提速线路基础改造方面,铺设百米定尺钢轨无缝线路约20?km,研究完成“提高钢轨伤损发现率”等13项安全成果,创造性地采用挖掘机对既有道床进行彻底清挖,采用路基检测新技术对路基进行普查。制定《200~250?km/h提速区段设备检修和安全管理办法》和《西安铁路局〈铁路200?km/h既有线技术管理暂行办法〉补充规定》,明确西宝提速区段设备检修标准和施工管理办法。
Xi’an Railway Bureau around the sixth large-scale speed up to strengthen the infrastructure of public works safety, dial line spacing and adjust the longitudinal line, replace the movable heart rail turnout, the use of total station check speed switch section, the line vertical and longitudinal section of the location , The main line is laid across the seamless lines, using geophysical methods such as ground penetrating radar to detect subgrade. In terms of speeding up the transformation of the basic line, the laying of 100-meter-long rail seamless track about 20 km, research completed “to improve the detection rate of rail injuries,” and other 13 safety results, the creative use of excavators on the existing ballast Thoroughly excavation, the use of subgrade detection of new technologies on the subgrade survey. Formulate the Supplementary Provisions of the Measures for Overhauling and Safety Management of Equipment in Speed-up Zone from 200 to 250 km / h and the Supplementary Provisions of Xi’an Railway Administration on the Interim Measures for the Technical Management of Existing Railways of 200 km / h, clarifying the equipment overhaul Standard and construction management approach.