论文部分内容阅读
为缓解日照港务集团公司矿砂堆放场地紧张局面 ,经过半个多月的施工 ,铁运公司利用编组场峰尾区废坑建成面积近 2万 m2 ,可存放 2 0万 t矿砂的堆场 ,同时 ,为配合矿砂装卸业务 ,建成了峰尾区矿砂装卸线。该工程包括峰头区部分线路道岔拆除、回填土倒运、峰尾区线路道岔铺设等工
In order to alleviate the tension of ore deposit sites in Rizhao Port Group Corporation, after more than half a month of construction, the railway transport companies used the built-up area of nearly 20,000 m2 in Fengwei tailing area of the Marshalling Yard to store 20 million t of ores. At the same time, To tie in with the ore handling business, built a tail ore loading and unloading line. The project includes the first part of the peak turnout turnout, backfill soil down, peak tail turnout lay line construction