施工项目开工前,应编制施工规划,设计出施工项目时间、质量、成本等目标。施工规划有三大主要内容。进度控制的目标是实现施工的工期目标。本文介绍了进度控制的意义、进度控制的全过程、基础工作以及进度控制的主要方法。主要的科学进度方法是流水作业和网络计划方法。本文专门介绍了国家标准规定的网络计划在项目计划管理中应用的一般程序。
Before the construction project starts, a construction plan shall be prepared to design the time, quality and cost of the construction project. There are three main contents of the construction plan. The goal of schedule control is to achieve the construction schedule goals. This article describes the significance of schedule control, the overall process of progress control, basic work, and the main methods of schedule control. The main scientific progress method is the flow production and network planning method. This article specifically introduces the general procedures for the application of the network plan specified by the national standard in project planning management.