石龙埧水电站位于云南省昆明市的西南,距昆明市約40公里,有安石公路通往安宁,与滇緬公路相接,交通方便。这电站是我国第一个水电站,全部工程設計由德国西門子洋行负责。第一厂于1910年开工,辛亥光复时期,西門子洋行的工程师逃到河內,停工数月,1912年始完成,落差为15公尺,安裝720瓩机組两台。第二厂完成于1926年,落差为16公尺,安裝276瓩机组两台与448瓩机组一台。第三厂与第二厂平行,修建較晚,完成于1937年,落差亦为16
Shilongtang Hydropower Station is located in the southwest of Kunming City, Yunnan Province, about 40 kilometers away from Kunming City. There are Anshun Road leading to tranquility and connecting with the Burma Road, which is easily accessible. This station is China’s first hydropower station, all engineering design by the German Siemens responsible for the foreign bank. The first plant was started in 1910. During the reign of Xinhai, Siemens Engineers fled to Hanoi to stop work for several months and completed in 1912 with a drop of 15 meters and installed 720 units of two units. The second plant was completed in 1926 with a drop of 16 meters and installed 276 units and 448 units. The third plant and the second plant parallel, built later, completed in 1937, the gap is also 16