论文部分内容阅读
最近我們曾先後瞭解了几个勘探队增產節約的進行情況。從這一次的檢查中可以看出,目前大部分勘探隊都已根據當地黨委的指示和部、局會議的精神向群众進行了動员,研究并製訂了自己的措施規划,有的并已提出了實現增產节約任務的具體措施和辦法。譬如803勘探隊通過群众的讨论和黨總支的研究以后,已经订出全隊全年节約五萬六千多元的增產节約計劃,他們製訂和實現节約計划的第一個根據和措施是提高鑽探工程效率。他們经過分析研究找出了鑽探效率之所以不高,主要是由於事故太多,因此今年準备改善泥漿的供应,尽量设法在泥质破碎层使用套管,以防止事故。這樣鑽探效率預計可以在去年的基礎上提高10%,每鑽進一米就可以节約投资10元左右,以3,000米計算卽可节約投资3萬元。第二是採用合理的勘探方法。該隊今年曾设计了140米水平坑道,根據對地質情況的研究,在這個地方打坑道,不一定能獲得預期效果,坑探成本比鑽探的成本高,而且打坑道需要僱用臨時工,因此他們計劃削掉坑探改用钻探,這樣就可以節省出一萬八千多元投资用在钻探上,解决钻
Recently, we have successively learned about the progress made by several exploration teams in increasing production and saving. It can be seen from this inspection that at present most of the exploration teams have mobilized the masses in accordance with the instructions of the local party committees and the ministerial meeting of the local government to study and formulate their own measures and plans and some have proposed Specific measures and measures to achieve the task of increasing production and saving. For example, 803 exploration team through the discussion of the masses and the party branch after the research, has set the team save more than 56,000 yuan a year saving and saving plan, they plan to develop and achieve the first basis and The measure is to improve the drilling efficiency. Their analysis shows that the reason why drilling efficiency is not high is mainly due to too many accidents. Therefore, this year we are prepared to improve the supply of mud and try to find ways to use casing in the muddy crushed layer to prevent accidents. This drilling efficiency is expected to be increased by 10% on the basis of last year, each drilling a meter can save about 10 yuan investment to 3,000 meters 卽 can save 30,000 yuan investment. The second is to use a reasonable exploration method. The team designed 140-meter-long tunnels this year. Based on the study of the geological conditions, tunneling in this area may not be able to achieve the expected results. The cost of pit-hunting is higher than that of drilling and it is necessary to hire temporary workers to tunnel. Plans to cut the pit exploration drilling, so that you can save more than 18,000 yuan investment in drilling, drilling solution