中国电线电缆进出口联营公司(下称中国电缆公司)在巴基斯坦卡拉奇市电网改造工程提供132千伏超高压电缆的一、二期线路及在塞浦路斯的132千伏超高压电缆项目先后于1993年底及1994年初顺利竣工。这两处线路都是从设计,安装铺设直到开通的交钥匙项目。 1.巴基斯坦项目 巴基斯坦项目是在1988年中标的,第一标供132千伏高压电缆108公里,随后二期线路中标,供同类电缆50余公里,同时作业.一期线路于1993年11月上旬全部并网通电一次成功,二期线路也在1993年12月底全部竣工。 这个标当初是在与法、英、意、日、韩等十几家国际著名公司的激烈竞争中而
The China Wire & Cable Import & Export Association (hereinafter referred to as the China Cable Corporation) has provided 132kv EHV cable for the first phase and the second line of the 132kv EHV cable project in Karachi, Pakistan, and the 132kV EHV cable project in Cyprus in late 1993. Completed successfully in early 1994. Both of these lines are from the design, installation, to turn-key turn-key projects. 1. The Pakistan project The Pakistan project was awarded in 1988. The first bid was for a 132 kV high voltage cable of 108 km. The second phase of the line was awarded as a bid for more than 50 km of similar cables. The first phase of the line was in early November 1993. All the grid-connected electricity was successful and the second-phase line was completed at the end of December 1993. This mark was originally in fierce competition with more than a dozen internationally renowned companies such as France, Britain, Italy, Japan and South Korea.