论文部分内容阅读
海洋石油南海西部公司第二口水平井——涠10—3N6井于6月16日钻达目的层,井深2214m。该井是5月10日开钻的,作业时间37天,最大井斜93°;自井深1904m进入水平井
Offshore Oil The second horizontal well of the South China Sea West Company, 涠 10-3N6, drilled to the target formation on June 16 with a well depth of 2214m. The well was drilled on May 10, with a working time of 37 days and a maximum deviation of 93 °. From the well depth of 1904 m into the horizontal well