论文部分内容阅读
西顿巴斯的井田都是由成对的立井开拓的——主井筒装备着箕斗提升设备,付井装备着罐笼提升设备。 西顿巴斯区第一批矿井箕斗井筒井底水窝的清理工作是采用从井底车场水平掘进倾角20°的斜巷,并装备单钩提升设备,以便送矿车到井底水窝的下水平装车。为了回收撒落的采掘物,水窝由一钢制斜板架盖着,板架穿过井壁孔,尾端装着带扇形闸门的榴槽,以便将采掘物装进矿车。水及水所带来的煤和矸石颗粒积存在一个作贮水池用的专用巷道里,该巷道位于主井筒水窝的下方。水用水泵排出,而沉下的煤泥用人工排出。为了排出付井筒水窝的水,也装设了专用的排水设备。
The wells in Sidon Bath are pioneered by paired uprisings - the main shaft is equipped with skip lifting equipment and the well is equipped with cage lifting equipment. The first wells in the Sidon Bath District to clean the bottom pit of the mine shaft were drilled with inclined angles of 20 ° from the level of the bottom pit and equipped with single hook lifting equipment to deliver the mine car to the bottom hole Under the level of loading. In order to recover the spilled material, the dimples were covered by a steel ramp, which passed through the hole in the borehole and was fitted with a grate with fan-shaped gates at the end to allow the digging into the tub. Coal and gangue particles from water and water accumulate in a dedicated lane for reservoirs below the wellbore of the main wellbore. The water is discharged by the pump, and the slime is sunk by hand. In order to drain the water well to pay wells, but also installed a dedicated drainage equipment.