12009年物资设备工作简要回顾1.1运输生产所需物资得到及时保证1.1.1确保了京广、陇海线集中修物资的及时供应。由于全路统一实行线路集中修,加上定点厂家数量较少,使得道岔、轨枕等物资生产供应十分紧张。在此困难条件下,物资系统团结协作,合力共为,加强与中铁宝桥、山桥、郑铁三佳等厂家沟通协调,紧张时期驻厂催货,保证了集中修工作的顺利进行。
Brief Review of the Work of Materials and Equipment in 12009 1.1 The Materials Needed for Transport and Production Are Guaranteed in Time 1.1.1 The timely supply of materials for centralized repair of Jingguang and Longhai lines has been ensured. Due to the centralized implementation of the whole road repair line, coupled with the small number of sentinel manufacturers, making switch, sleeper and other supplies production and supply is very tight. Under such difficult conditions, the materials system worked in unity and cooperation to strengthen communication and coordination with manufacturers such as Baoqiao, Shanqiao and Zhengtie Sanjia in China Railway Construction. During the intense period, the factory urged cargoes to ensure the smooth progress of the intensive repair work.