伏尔加—波罗的海水道建筑物的变形及渗透情况

来源 :水运工程 | 被引量 : 0次 | 上传用户:troy0215
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
伏尔加-渡罗的海水道全长361公里,基岩为上泥盆纪沉积层,岩壳为很厚的冰川沉积层,大部分都是由砾石亚粘土和冰水砂构成。 水道上建有五座水利枢纽,共有7座船闸、5个土坝、20个防水堤和5个溢洪道,3座水电站。 船闸水头除6号闸为17.20米外,其余都为13.25~13.50米。所有船闸的闸首都是整体重力式钢筋混凝土结构。闸室型式除4、5号闸为坞式外,其余都为分离式。船闸的主要结构件是定型化的。所有船闸均采用头部输水系统。 The volcanic-dura seaway is 361 km long. The bedrock is a sedimentary upper Devonian deposit. The rock crust is a thick glacial sediment, mostly composed of gravelly loam and ice-water sand. The waterway has built five water conservancy hubs, a total of seven locks, five earth dams, 20 watertight embankments and five spillways, three hydropower stations. In addition to the lock on the 6th gate is 17.20 meters for the gate, the rest are 13.25 ~ 13.50 meters. The gates of all ship locks are monolithic, gravity-reinforced concrete structures. In addition to gate type gate No. 4,5 gate for the dock-style, the rest are separated. The main structural parts of the lock are finalized. All locks are used head water delivery system.
其他文献
1976年9月,上无十三厂生产的DJS—131型小型多功能计算机在我厂开始安装调试,9月底投入运行;同时投入运行的外部设备有G—2光电机,B—55电传机和CK—160穿孔机;相继配套使用
针对复杂背景下单帧红外图像中的弱小目标检测问题,提出了一种级联的改进Asymmetric AdaBoost算法。该算法通过提取红外小目标梯度对比度、邻域灰度分布等多个有效特征,充分
由河南黄河河务局科技办公室、新乡黄、沁河修防处灌注桩工程队和河北省新河县钻机厂研制的XZ Q-1型斜孔组合钻机,在原阳县双井及开封县欧坦控导工程进行了钻孔和灌注素混凝
受时代影响,大众文化消费的审美趣味在发生变迁,以中国传统杂技为例,从单纯欣赏杂技有惊无险的高超技艺,到"技"和"剧"并重的杂技剧的出现,以及杂技与舞蹈、外来文化的融合,借
几乎所有的青春电影都在告诉我们一个道理,长得漂亮的人才有青春。但青春期是人人都有的,什么春心萌动小鹿乱撞的情绪,是不以人的颜值为转移的。比如,我们的王凯旋同志,虽然
继电影《周恩来的四个昼夜》在全国产生巨大反响后,著名导演陈力精心打造的又一力作——41集重大革命历史题材电视剧《海棠依旧》,被中宣部、国家新闻出版广电总局作为纪念中
一、混凝土坝合理化施工的必要性最近修筑的高坝,填筑坝比混凝土坝多,这是因为适合修建混凝土坝的地形和地质条件的坝址已经减少,这种坝址修建填筑坝往往比较有利。由于填筑
近年我国从西德本茨(Mercedes—Benz)汽车公司进口了许多本茨汽车。这批本茨汽车电路尤以1926型和2626型较为复杂。本文试图以该种车型电路来说明这类汽车的电路特点。该型电
本文简述了能将硫代硫酸盐还原成硫化氢(H2S)的严格厌氧菌的重要特征。虽然在微生物界,硫代硫酸盐的还原作用是一种普通的新陈代谢作用,但它与微生物腐蚀之间的潜在关系未见过报
广东省珠江三角洲沙围田区是本省主要的商品粮基地。由于地处河口潮区,地势低平,河网纵横,常受洪潮顶托,排水不良,地下水位高,土层密实,土壤透水通气性差。采取排水措施,降