论文部分内容阅读
2002年,对于内蒙古阿拉善盟是极不寻常的一年。为贯彻落实朱总理“西部地区交通基础设施建设是西部开发第一要务”的指示精神,适应西部开发的需要,全盟上下协作努力,经过数月的艰苦拼搏,完成了994公里的S217和S307两线旗通沥青道路工程的勘测、设计、施工、建设等全部工程,结束了阿拉善左旗不通油路的历史。至
In 2002, it was an extremely unusual year for Alxa League in Inner Mongolia. In order to carry out the spirit of Premier Zhu ’s directives that transport infrastructure construction in the western region is the most important task in the development of the western region and meet the needs of the development of the western region, the AU has worked collaboratively from top to bottom and completed 994 km of S217 after months of arduous struggle And S307 two lines Qi Tong Asphalt Pavement engineering survey, design, construction, construction and all other projects, the end of the history of Alxa Left Banner non-through oil. to