论文部分内容阅读
岩土边坡工程治理的过程中,应用预应力锚索有助于对岩土主体施加一定的压力,以此改变土体的具体受力情况,同时也能有效的提升岩土主体的强度。预应力锚索在实际的工作过程中,改变了岩土主体的受力状态,并且有效的促进岩土主体的稳定性,它具备的工序流程相对简单,施工的效率较高,质量容易把握并控制,有助于加快施工进度。本文将分析预应力锚索在岩土边坡工程治理上的应用,明确预应力锚索对岩土边坡工程治理的具体施工流程。
In the process of geotechnical slope engineering treatment, the application of prestressed anchor cable can help to exert a certain pressure on the geotechnical main body, so as to change the specific stress of the soil body, and also can effectively enhance the strength of the geotechnical main body. Prestressed anchor cable in the actual work process, changing the stress state of the main body of rock and soil, and effectively promote the stability of the main body of rock and soil, it has a relatively simple process flow, construction of high efficiency, quality easy to grasp and Control helps to speed up construction. This paper will analyze the application of prestressed anchorage cable in engineering treatment of geotechnical slope and clarify the concrete construction flow of prestressed anchorage cable for geotechnical slope engineering.