论文部分内容阅读
结合金塘大桥预制连续箱梁架设施工的测量控制所遇到的问题,对连续箱梁架设的线性控制以及标高的控制技术,优化布点控制方案作一描述。
In combination with the problems encountered in the measurement and control of prefabricated continuous girder erection of Jintang Bridge, a description is given of the linear control of erection of continuous girder, the control technology of elevation and the control plan of optimal distribution.