论文部分内容阅读
现在工程的建设采用的方法,主要是翻模、滑模和爬模三种高墩施工技术。本篇文章,针对此技术进行了系统的分析,同时结合墩柱的尺寸,主要为:为5.5m×2.5m的等截面矩形高墩柱为主要例加以阐述,从施工的构成、施7-52艺和施工要点等方面对三种施工技术分别进行论述,同时提出了施工中所面临的优缺点,同时以期为类似的工程为其施工提供参考。
The construction of the project now uses the method is mainly inverted mold, sliding mode and climbing mode three high pier construction technology. This article, based on a systematic analysis of this technology, combined with the size of the pier, mainly for: 5.5m × 2.5m rectangular cross-section rectangular high pier as the main example to elaborate, from the construction of the composition of 7- 52 arts and construction points of the three construction techniques are discussed separately, while the proposed construction of the advantages and disadvantages, at the same time with a view to similar projects for its construction to provide a reference.