漫湾水电站位于澜沧江中游河段云县和景东县交界的漫湾镇,距昆明约500km,是澜沧江干流开发的首期工程(规划建设的第3级),时为云南省建国以来投资最大的建设项目,也是已建成的我省最大的水电站。电站总装机150万kw,分两期建设:一期装机容量 125万 kw,年发电量 62亿 kwh;待小湾电站建成后再装一台25万
Manwan Hydropower Station is located in Manwan Town at the junction of Yunxian County and Jingdong County in the middle reaches of the Lancang River. It is about 500km away from Kunming. It is the first phase of the development of the mainstream of the Lancang River (level 3 of planning and construction) and the largest investment since the founding of the People’s Republic of China Construction projects, but also built the province’s largest hydropower station. The total installed capacity of the power station is 1.5 million kw, which will be constructed in two phases: an installed capacity of 1.25 million kw and an annual generating capacity of 6.2 billion kwh. After the completion of Xiaowan Power Station, a 250,000 kw