搜索筛选:
搜索耗时5.2799秒,为你在为你在102,285,761篇论文里面共找到 2 篇相符的论文内容
类      型:
[会议论文] 作者:Bole Jiang,Jiangning Yang,Yang Chen, 来源:35th IAHR World Congress(第三十五届国际水利学大会) 年份:2013
There are two diversion tunnels for the construction of Shuibuya hydraulic project.When the tunnel is at service, the discharge through the tunnel is over 5,000m3/s....
[会议论文] 作者:Zhijuan Wang,Bole Jiang,Guobing Huang, 来源:35th IAHR World Congress(第三十五届国际水利学大会) 年份:2013
The stilling basin with step-down floor is more and more popular in the high water head discharge structure because of its high energy dissipation efficiency and well-adaption,while, this kind of ener...
相关搜索: