搜索筛选:
搜索耗时5.0156秒,为你在为你在102,285,761篇论文里面共找到 7 篇相符的论文内容
类      型:
[期刊论文] 作者:Chenyuan BAI,Ziniu WU, 来源:中国航空学报(英文版) 年份:2022
The transit time difference of fluid particles moving along the upper and lower surfaces of a lift-producing airfoil is studied here both theoretically and numerically.We show that,under thin airfoil assumption and for potential flow,the tr......
[期刊论文] 作者:Chenyuan BAI,Juan LI,Ziniu WU, 来源:城市道桥与防洪 年份:2018
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Zijun CHEN,Chenyuan BAI,Ziniu WU, 来源:中国航空学报(英文版) 年份:2020
Mach reflection in steady supersonic flow is an important phenomenon having received extensive studies, among which simplified theoretical models to predict the...
[期刊论文] 作者:Sicheng LI,Chenyuan BAI,Jing LIN,Ziniu WU, 来源:中国航空学报(英文版) 年份:2020
Wagner problem is originally conced with inviscid flow and unsteady force due to a small step motion, or attaining of a small angle of attack, of an airfoil in...
[期刊论文] 作者:Zijun CHEN,Jing LIN,Chenyuan BAI,Ziniu WU, 来源:城市道桥与防洪 年份:2018
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Chenyuan BAI,Juan LI,Sheng LI,Sicheng LI,Ziniu WU, 来源:城市道桥与防洪 年份:2019
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:Jie LU,Yongli GAO,Xiaojing WANG,Chenyuan BAI,Bing WANG,Ziniu WU, 来源:城市道桥与防洪 年份:2018
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
相关搜索: