搜索筛选:
搜索耗时3.2023秒,为你在为你在102,285,761篇论文里面共找到 4 篇相符的论文内容
发布年度:
Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconst
[期刊论文] 作者:N.Hosseini,K.Oraee,K.Shahriar,,
来源:中南大学学报(英文版) 年份:2004
Mining operation,especially underground coal mining,always has the remarkable risks of ground control.Passive seismic velocity tomography based on simultaneous...
[期刊论文] 作者:S.Dehghan,K.Shahriar,P.Maarefv,
来源:矿业科学技术学报:英文版 年份:2013
Fetr6 is an underground mine in which chromite is extracted using stope and pillar mining method. Despite of all improving works such as roof supporting and rep...
3-D numerical modelling of Domino failure of hard rock pillars in Fetr6 Chromite Mine, Iran, and com
[期刊论文] 作者:S.Dehghan,K.Shahriar,P.Maarefvand,K.Goshtasbi,,
来源:Journal of Central South University 年份:2013
Fetr6 is an underground mine using the stope-and-pillar mining method. As there was some evidence regarding pillar failure in this mine, improving works such as...
Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconst
[期刊论文] 作者:N.Hosseini,K.Oraee,K.Shahriar,K.Goshtasbi,,
来源:Journal of Central South University 年份:2012
Mining operation, especially underground coal mining, always has the remarkable risks of ground control. Passive seismic velocity tomography based on simultaneo...
相关搜索: