搜索筛选:
搜索耗时4.4590秒,为你在为你在102,285,761篇论文里面共找到 9 篇相符的论文内容
发布年度:
Strength Regularity and Failure Criterion of High-Strength High-Performance Concrete under Multiaxia
[期刊论文] 作者:HE Zhen-jun,SONG Yu-pu,
来源:西南交通大学学报 年份:2004
Multiaxial compression tests were performed on 100 mm × 100 mm × 100 nun high-strength high-performance concrete (HSHPC) cubes and normal strength concrete (N...
Experimental investigation on strength and deformation of plain high-strength concrete under multiax
[期刊论文] 作者:HE Zhen-jun,SONG Yu-pu,
来源:城市道桥与防洪 年份:2009
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
Experimental and theoretical research on residual strength of plain concrete under compressive fatig
[期刊论文] 作者:MENG Xian-hong,SONG Yu-pu,
来源:城市道桥与防洪 年份:2008
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
[期刊论文] 作者:ZHANG Jian-ling,SONG Yu-pu,HON,
来源:城市道桥与防洪 年份:2008
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
Experimental study on tensile failure process of double-K fracture parameters in roller compacted co
[期刊论文] 作者:HUANG Zhi-qiang,SONG Yu-pu,WAN,
来源:城市道桥与防洪 年份:2008
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
Finite Element Analysis and Linear Regression of Maximum Temperature for Inner Wall of Chimney Found
[期刊论文] 作者:ZHANG Yu-mei,SONG Yu-pu,ZHAO Y,
来源:中国矿业大学学报:英文版 年份:2005
The uniform design method was adopted and the twenty-four groups of different geometric and physical parameters were chosen. The finite element model was built....
[期刊论文] 作者:LIU Gui-rong,SONG Yu-pu,QU Fu-lai,
来源:中南大学学报(英文版) 年份:2010
The effects of fire exposure,reinforcement ratio and the presence of axial load under fire on the seismic behavior of reinforced concrete(RC)shear walls were in...
[期刊论文] 作者:WANG Xue-zhi,SONG Yu-pu,DONG J,
来源:城市道桥与防洪 年份:2009
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
Experimental study on biaxial mechanical behavior of concrete suffered high temperature and constitu
[期刊论文] 作者:ZHANG Zhong,SONG Yu-pu,QIN Li-,
来源:城市道桥与防洪 年份:2008
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥...
相关搜索: