搜索筛选:
搜索耗时4.7395秒,为你在为你在102,285,761篇论文里面共找到 3 篇相符的论文内容
发布年度:
Two new reinforcement techniques applicable in high steep slopes along the Chengdu-Lhasa Highway, So
[期刊论文] 作者:YANG Zhifa ZHU Jiewang ZHANG L,
来源:中国科学:技术科学英文版 年份:2003
Anti-slide pile and anchoring hole are two types of reinforcement techniques popularly used in slope reinforcement. However, some defects of these two technique...
Tectonic Taphrogenesis and Paleoseismic Records from the Yishu Fault Zone in the Initial Stage of th
[期刊论文] 作者:TIAN Hongshui,ZHANG Zengqi,ZHANG Banghua,ZHU Jiewang,SANG Zhongxi,LI Hongkui,,
来源:Acta Geologica Sinica(English Edition) 年份:2013
The Yishu fault zone (mid-segment of the Tanlu fault zone) was formed in the Presinian. Periodic tectonic activities and strong seismic events have occurred alo...
[会议论文] 作者:ZHU Jiewang,祝介旺,LI Yanqin,李艳芹,SUN Daiju,孙代聚,TIAN Hongshui,田洪水,FU Feiying,付飞营,
来源:第九届全国工程地质大会 年份:2012
某机场位于黄河中下游的冲洪积地层上,地质条件较差,为完成地基所承担的功能,需要填土提高高程和进行地基处理。针对一次性填土到位进行强夯的地基处理方案和分层填土分层冲击碾压的地基处理方案,利用价值工程原理中的定量直接打分法,对两个方案完成地基处理功能的程......
相关搜索: