Sino-French school on the 2 infinities

来源 :第10届中法粒子物理联合实验室研讨会(10th Workshop of the France China Particl | 被引量 : 0次 | 上传用户:Monking
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
SINO-FRENCH SUMMER SCHOOL Organized at the initiative of the French Ambassy http://www.chine.campusfrance.org/fr/inscription-ecoles-d-ete-2017 Collaboration between IPHC(Strasbourg) and CPPM(Marseille) @ IPHC(Strasbourg) –July 2-11,2017 @ CPPM(Marseille) –July 11-22,2017 Summer Schoolaimedat Chinese Students《close》to starta PhD We can host 20-30 students Program of the School A total immersion in the physics
其他文献
CPPM/Atlas Chinese Cluster Collaboration CPPM/ACC collaboration for design and test of Front‐End pixel electronics for ATLAS phase Ⅱ upgrade.Scientific cooper
会议
10 years of exchanging people and IHEP‐IPNL:Collaboration started in 2007 6 IHEP doctoral students have visited IPNL for stays of between 2‐6 months:TAO Junqu
会议
Outline Introduction Gamma ray astronomy @ LHAASO Project approval progress Preparation for detector deployment Early stage construction Conclusion
会议
Outline Double ring scheme Preliminary lattice design with new parameters and scheme Partial double ring scheme Mitigation of sawtooth effects for partial doubl
会议
Main topics(2016)Energy frontier physics(5) Flavour physics(2) Neutrino and non‐accelerators physics(4) Hadron Physics(1) Astroparticle physics(2) Instrumentat
会议
X-ray sources Facilities Facilities Synchrotron Radiation Free Electron Laser Thomson scatteringmachine
会议
Layout of CEPC Double Ring CEPC RF distribution CEPC bunch distribution Machine constraints/given parameters Energy E0 Circumference C0 NIP Beam power P0 βy
会议
Outline LHAASO introduction Prospects for cosmic ray spectra bellow 100 PeV Summary Large High Altitude Air Shower Observatory KM2A:5195 Eds:1 m2 each,15m spaci
会议
Outline Introduction Baseline and IR design Final focusing magnets Solenoid compensation Beam pipe Mechanical supporting Beam induced backgrounds Luminosity cal
会议
The LHCb experiment The LHCb data taking 3 fb-1 collected in Run 1 2 fb-1 collected in 2015 and 2016,~1.5 fb-1 expected in 2017 Higher run 2 energy:beneficial fo
会议