针对梯级水库防洪任务和边界条件发生的变化,建立了一种确定梯级水库防洪库容分配的数学模型,耦合水库电力调度优化、防洪效益优化等多种目标,把梯级水库预留的防洪库容最小作为约束条件,采用逐次优化算法求解出使梯级水库发电效益最大的非劣解集.以清江干流梯级水库为例,确定水布垭和隔河岩水库防洪库容的最优分配策略.在水布垭预留5亿m3和隔河岩预留不小于1.5亿m3防洪库容的前提下,若发生100年一遇的洪水时,隔河岩水库的最高调洪水位不会超过200m,可以满足防洪安全.该研究为梯级水库防洪库容分配提供了一种新的探讨思路.
其他文献
Supersonic arc plasma jets have the features of high speed and high total temperature,and have been used in material processing,space electric propulsion and aero-thermodynamic ground testing.However,
The technology of antenna miniaturization and electromagnetic radiation enhancement has been a hot topic in recent years.And numerous novel methods and techniques have been proposed and investigated t
The surface discharge plasma,as an indirect plasma generating method,is an important tool to study the interaction between plasma created reactive oxygen and nitrogen species (RONS) and the biomedical
会议
A conductive coatings was prepared using multiwalled carbon nanotubes (MWCNTs) as a conductive pigment and polyacrylate (PA) as a polymer matrix.
SiOx is widly used in semiconductor,packing,harding coating because of its excellent performance of heat resistance and small thermal expansion coefficient.
In this paper,we use atmospheric radio frequency (rf) plasma chemical vapor to prepare TiO2 nanocrystalline film and to study the plasma gas reaction factors influencing the film structure.
实时洪水预报精度较高是实施汛限水位动态控制的基础,其不确定性又是动态控制的主要风险源.针对洪水预报不确定,采用贝叶斯水文不确定性处理器将确定性预报转化为概率预报;针对入库洪水预报精度较高,建立了考虑未来洪水大小的三峡水库汛限水位实时控制模型.应用结果表明,相对于原设计调度方案,实时动态模型根据预报洪水大小执行不同的预蓄预泄策略,在不增加防洪风险的前提下可显著地提高水库的发电效益.基于贝叶斯修正的概
TiO2 films has attracted much attention for its wide applications inanticancer or gene therapy modalities,bio-compatible fluorescent labels,photocatalysts,photo/electrochromic devices,photonics crysta
水库的调蓄作用,改变了其下游天然洪水的水文情势,直接影响下游断面的设计洪水.以清江流域梯级水库为例,通过基于Copula函数的条件期望和最可能地区组成,结合规范采用的同频率地区组成方法,拟定了五种水布垭水库和区间流域洪水组合方案,推求受水布垭水库调蓄影响的隔河岩断面设计洪水.计算结果表明:与天然情况相比,考虑水布垭水库调蓄的不同重现期隔河岩断面设计洪水均减小.削减最大的是条件期望组合Ⅰ方案,最小的