论文部分内容阅读
The paper studied the utilization of Lead/Zinc (Pb/Zn) mine tailings for production of high performance Portland cement.Lead/Zinc mine tailings, Limestone,shale, and ironstone were mixed of six different compositions.The grounded materials were burned at 1350℃, 1400℃ and 1450℃ for 30min respectively in laboratory.