【摘 要】
:
Contents 1.Infrastructure Survey by using ICT,2.MIMM-R 2.1 Outline of MIMM-R 2.2 High-precision Topographical Surveys 2.2 Laser tunnel Survey Method 2.3 Tunnel
【机 构】
:
PacificConsultantsCo.,Ltd.
【出 处】
:
The 6th China-Japan Workshop on Tunneling Safety & Risk(CJTS
论文部分内容阅读
Contents 1.Infrastructure Survey by using ICT,2.MIMM-R 2.1 Outline of MIMM-R 2.2 High-precision Topographical Surveys 2.2 Laser tunnel Survey Method 2.3 Tunnel Image Survey Method 2.4 Radar Tunnel Survey Method.
其他文献
CONTENTS 1.LHCb Collaboration,arXiv:1507.03414 2.Previous Studies 3.Following Studies 4.Our Study through QCD Sum Rule 5.Summary
Outline1.Multi-face of QCD?2.Heavy pentaquark production at LHCb 3.Kinematic effects or genuine states?4.Summary 1.Multi-face of QCD?
OutlineⅠ.Introduction Ⅱ.Glueballson the lattice Ⅲ.XYZ particles on the lattice Ⅳ SummaryⅠ.Introduction1.The lattice rormulation of QCD---Lattice QCD
Outline:1.Introduction 2.Penta-quark states with strangeness 3.From Strangeness to charm & beauty 4.Conclusions1.Introduction Spectroscopy → interaction dynam
Hadrons:normal & exotic Quark model:hadrons are composed from 2(meson) quarks or 3(baryon) quarks QCD does not forbid hadrons with Nquarks 2,3-Glueball:Nquarks
1.Introduction Difference in design and results…… 1.Introduction We should reduce these risks to perform rational tunnel construction,Effective survey and mea
Outline LHCb experiment Highlights of results on CP & rare decays Bc studies J/ψ production at 13 TeV Observation of Pentaquark states Conclusions
注浆压力的大小会影响围岩裂隙通道的形成,当注浆压力达到劈裂注浆前为渗透注浆,不会有新的裂隙生成,浆液的扩散半径较小,围岩抗渗透的能力并没有得到较好的改善;当注浆压力达到
Najio Road Hachiman Tunnel Construction Site Shioze-cho Najio,Nishinomiya-city,Hyogo Prefecture Ordering party Ministry of Land,Infrastructure,Transport and Tou
Content 1 Definition of the shallow tunnelling method(STM),2 Insights into the STM,3 Cases of subway station construction using STM,4 Numerical simulations of d