Research on Dynamic Performance of Two Trains Meeting on a Cable-Stayed Bridge

来源 :2017年世界交通运输大会 | 被引量 : 0次 | 上传用户:chengyo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  To investigate the dynamic performance of bridge and vehicle when two trains meeting on a 1092m main span combined highway and railway cable-stayed bridge,the vehicle-track-bridge coupling vibration system is used to study the dynamic response of the bridge under diverse time intervals of train running on the bridge.The computed results show that the time interval of trains running on the bridge has less impact on the dynamic response of the train than that of the bridge.Then the effect of crosswind is taken into consideration to investigate the aerodynamic performance of the bridge and the vehicle using wind-vehicle-track-bridge coupling vibration system.The results indicate that the aerodynamic performance of the bridge under the crosswind is significantly different from the windless condition,and compared with the freight train,the passenger train is more sensitive to the enlargement of wind speed.
其他文献
Aero-elastic instability is one of the important issues for wind-resistant design of large span suspension and cable-stayed bridges.In this paper,a novel numerical method with large-eddy simulation tu
Coupled fatigue-corrosion is more detrimental for reinforced concrete bridge deck slabs than either of fatigue or corrosion occurs separately.The main objectives of this study is to obtain a further u
Based on a long-span suspension bridge structural health monitoring system of the east China sea,in terms of the long-term in-field measurement data,the wind field characteristics of statistical chara
为解决传统钢筋混凝土(RC)拱桥自重大、建造周期长、施工风险高、耐久性低等问题,提出一种预制低配筋超高性能混凝土(UHPC)箱形拱的方法,该方法结合超高性能混凝土高抗压强度、拱结构主要承受轴压荷载的特点。对设计的拱模型进行L/4 处单点加载面内受力全过程试验研究,并对预制低配筋UHPC 箱形拱的荷载-位移曲线、裂缝发展、截面应变与破坏过程进行分析,建立考虑材料与几何非线性的有限元模型,分析了试验值
针对高速铁路隧道在高水压和列车动荷载耦合作用下隧道底部隆起开裂问题,采用数值模拟和现场实测的方法,研究仰拱处应力随时间和空间坐标的变化,基于扩展有限元(XFEM)方法精细化研究隧道仰拱开裂的机理和裂缝模态。结果 表明:高水压和仰拱底部围岩泡水软化是隧道仰拱结构隆起的主要原因,列车动荷载将加剧仰拱结构的破坏。隧道仰拱隆起整体呈现为中间高两边低,中心排水沟处首先出现裂缝,由于轨道板、仰拱填充层与衬砌结
The geological conditions of tunnel engineering are complex and changeable,which leads to great difference between the surrounding rock classification in survey design stage and in construction stage.
Long-span cable-stayed bridges exhibit some features which are more critical than typical long span bridges such as geometric and aerodynamic nonlinearities.A three-dimensional nonlinear fully-coupled
为提高钢筋混凝土梁受剪承载力的预测精度和稳定性,本文提出了一种改进的受剪承载力模型。首先,揭示了无腹筋混凝土梁中存在的剪压和斜拉两种主要剪切传力机制,并将受压区划分为剪压区和斜拉区;其次,分别建立了两局部区域的混凝土破坏准则,推导得到了两种传力机制的剪切贡献理论表达式。进一步,基于桁架模型计入箍筋项的剪切贡献,建立了钢筋混凝土梁的受剪承载力解析计算公式。该公式具有明确的物理涵义,能够反映混凝土强度
针对既有在役拱桥安全状态评估方法主观性过强的问题,基于层次分析理论框架,考虑评估者主观的犹豫不决,首次提出了基于犹豫层次分析法与TOPSIS 法的拱桥安全状态评估模型。基于概率型犹豫偏好关系,构建概率型犹豫积型偏好关系矩阵,确定拱桥评估权重;考虑拱桥实际服役状态,建立构件状态决策矩阵,基于理想解与反理想解的欧式距离,求解表征拱桥相对安全状态的贴近度,最后,以三座拱桥为工程实例进行了验证,结果表明,
为研究超大跨度公路隧道施工过程中围岩压力的分布变化情况,本文以老虎山隧道为依托,采用现场试验与有限元数值模拟相结合的方法对其施工过程中围岩压力的分布规律进行研究,得到以下结论:(1)老虎山隧道围岩压力整体分布不均,拱部和仰拱处的围岩压力最大,拱腰和拱脚处的围岩压力最小;(2)下导开挖使拱墙处的围岩压力出现明显下降,降幅约12%,拆除中隔壁使隧道拱顶处的围岩压力出现明显下降,降幅约11%;(3)在隧