论文部分内容阅读
Subgrade settlement monitoring is very important to guarantee the railway safety.A new method which automatically measure subgrade layered settlement and lateral displacement is proposed in this paper,and the structure of monitoring system is also introduced.The displacement of the settlement ring,which is set in the outer wall of the PVC pipe,is consistent with the displacement of the measured soil body.