崩落采矿法扩漏质量验收公式的推导

来源 :云南冶金 | 被引量 : 0次 | 上传用户:coophui
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我矿氧化矿设计为底盘漏斗崩落采矿法,因其矿岩破碎,漏斗喇叭口只能在采场大爆破时一并放炮形成,过去一直采用相似估计法验收其工程量,为此,很难检测各凿岩参数在爆破之后满足设计要求之程度,乃至形成部分斗井爆破之后仍未扩开的现象。鉴于上述情况,笔者根据实地工作体会,对扩漏工程中的眼数、眼深、倾角和圈间距等用数学方法的导示公式,进行扩漏工程质量的验收,取得了很好效果,保证了扩漏质量,现简述如后。 Mine ore oxidant designed for the chassis funnel caving mining method, because of its broken ore, funnel bell mouth blasting can only be formed in the stope together with blasting, the past has been using the similar estimation method to accept the amount of the project, for which it is difficult Detection of the rock parameters in blasting to meet the design requirements of the degree, and even after the formation of part of the bucket well blasting has not yet expanded phenomenon. In view of the above, the author based on field work experience, the number of eyes in the expansion project, the depth of the eyes, the angle and the distance between the circle and other mathematical methods used to formulate the leakage of the quality of the project acceptance, and achieved good results, to ensure The leakage of quality, is now outlined as follows.
其他文献
辽西地区自然气候以干旱为主, 栓皮栎与知母都是本地区乡土物种,苗圃地培育栓皮栎园林苗木,株行距较大,年限较长.在株行距内间作知母,对上层乔木培育无不良影响,两种经济作物
期刊
会议